INNOVATION
We’ve developed two innovative systems that change how utility infrastructure is installed: NICE® (Non-Intrusive Cable Extraction) and NITE (Non-Intrusive Tank Extraction).
Both technologies allow us to work beneath live roads, networks, and critical infrastructure without the traditional excavation. No digging. No surface disruption. Less environmental impact. The engineering complexity stays the same. The approach changes everything.
We’ve trialled and refined both across UK projects. They work. It’s better for clients. It’s better for the environment. Projects complete faster, cleaner, safer.
NICE®
NICE® is JSM’s no dig, direct buried cable removal system – it is an advanced method for removing underground decommissioned fluid filled cables without the need for traditional open cut trenching for the length of the cable thus mitigating any environmental risks of leaving the cables buried. It is an approved method of cable extraction for National Grid.
NITE
NITE is JSM’s proprietary method and toolset for the removal of buried decommissioned oil cable feeder tanks without the requirement for large deep excavations.
Both methods offer significant physical advantages by reducing disturbance and disruption but also significantly reduces health, safety and environmental impacts during the extraction process over traditional methods.