Value: Multi million
Distance: 21,647m
Duration: 4 months

Hollow Core Fibre Connection – Data Centre

The client required 21.6km of hollow core fibre (HCF) to be installed in East London.

THE CHALLENGES

Challenges included securing borough council approvals and navigating street cabling conditions while maintaining HCF integrity.

WHAT WE DELIVERED

  • Works included detailed route surveys, planning, and securing all necessary permits and approvals
  • Installation of 2,282 m of ductwork, 14 chambers, and proving of 21,093 m of ducting to ensure route integrity
  • Installation of 21,647 m of 4-fibre HCF cable and 21,647 m of 192-fibre singlemode cable, including splicing and testing to specification
  • Construction deliverables included as-built drawings, fibre routing SLDs, and final test results to confirm compliance

 

 

2.3km

New Ductwork 

14

New Chambers 

4 fibre

HCF Cable 

specialisms used

  • As-built drawings
  • Testing
  • Hollow Core Fibre
  • Splicing
  • Fibre installation
  • Permits
Strong coordination and operational control were key to delivering this project efficiently in a busy urban environment.
Toby Ford
Head of Operations