Value: Multi Million
Diameter: 160mm to 89mm ducts
Duration: 25 months

132kV Energy to Waste Connection

The client required the design, installation, and commissioning of a new 132kV electrical supply system to support energy recovery operations in Belvedere, Dartford.

THE CHALLENGES

The tidal location of the river created a significant flood risk and required careful environmental planning. Complex signal structures on constrained bridge crossings introduced additional engineering and approval challenges, while the proximity to a dual carriageway demanded strict traffic management. The site’s ecological sensitivity, including nesting birds and protected wildlife, limited construction activities, alongside the need to account for structural load and thermal expansion. The exposed installation also presented risks of vandalism and unauthorised access.

WHAT WE DELIVERED

  • Special Engineering Difficulties (SED) included constrained bridge crossings requiring Horizontal Directional Drilling (HDD) beneath roads
  • Potential for flooding due to the river’s tidal nature necessitated placing the pipe bridge above the bridge soffit and within the protection of the Thames Estuary flood defences. Polytetrafluoroethylene (PTFE) sliding bearings and expansion joints were used to accommodate thermal and structural movement without compromising flood resilience

10.6km

cable route

132kV

Electrical supply system

160mm to 89mm

Ducts

 

 

specialisms used

  • Installation
  • Commissioning of high-voltage
  • Bridge crossings
  • HDD (Horizontal Directional Drilling)
  • Diamond coring
This project brought together complex engineering and environmental considerations in a highly constrained location. Through detailed planning and close coordination, we were able to deliver a compliant and resilient 132kV connection while minimising disruption and ensuring long-term reliability.
Macc Flynn
Client Project lead