33kV Solar Farm Connection

The client required the design, installation, and commissioning of a 35MVA 33kV DNO switchroom and cable route in Essex.

THE CHALLENGES

An adjacent third-party project required excavation along the same route, creating a high risk of disruption to local residents, alongside the challenge of securing design approval from UK Power Networks

WHAT WE DELIVERED

  • Works included detailed design and approvals, installation of a 3.6km 33kV cable route, and post-construction commissioning and energisation
  • An adjacent 3rd party project required a collaborative shared trench arrangement

35

MVA

3.6km

33kV CABLE ROUTE

33kV

 DNO

 SWITCHROOM

specialisms used

  • Principal designer
  • Compound construction
  • DNO switchroom & substation
  • 3.6km cable route
  • 33kV Cables & Duct installation
  • LVAC supplies
  • Jointing & Terminations
  • Hot and cold commissioning
    with Energisation
Careful planning and close collaboration were key to navigating the approval process and coordinating the works. That allowed us to maintain programme and deliver a reliable outcome without unnecessary disruption.