FROM CONCEPT
TO CONNECTION
snap shot
Value: Multi Million
Voltage: 33kV
Duration: 12 months
33kV Solar Farm Connection
The client required the design, installation, and commissioning of a 35MVA 33kV DNO switchroom and cable route in Essex.
THE CHALLENGES
An adjacent third-party project required excavation along the same route, creating a high risk of disruption to local residents, alongside the challenge of securing design approval from UK Power Networks
WHAT WE DELIVERED
- Works included detailed design and approvals, installation of a 3.6km 33kV cable route, and post-construction commissioning and energisation
- An adjacent 3rd party project required a collaborative shared trench arrangement
35
MVA
3.6km
33kV CABLE ROUTE
33kV
DNO
SWITCHROOM
specialisms used
- Principal designer
- Compound construction
- DNO switchroom & substation
- 3.6km cable route
- 33kV Cables & Duct installation
- LVAC supplies
- Jointing & Terminations
- Hot and cold commissioning
with Energisation
“Careful planning and close collaboration were key to navigating the approval process and coordinating the works. That allowed us to maintain programme and deliver a reliable outcome without unnecessary disruption.“
Martyn Crocker
Operations Director