FROM CONCEPT

icon

TO CONNECTION

snap shot
Value: Multi Million
Voltage: 33kV
Duration: 8 months

33kV Solar Farm Connection

The client required the design and delivery of a 20MVA 33kV DNO switchroom and cable route for a solar development in Staveley, Derbyshire.

THE CHALLENGES

Design approval from NGED presented a key challenge, which was addressed by working closely with the client, their contractors, and NGED to develop an acceptable design. Additionally, potentially disruptive streetworks required careful management, with the JSM Streetworks team collaborating with the local highways authority to secure permits and minimise impact on the local community.

WHAT WE DELIVERED

Supplied and installed a 33kV DNO switchroom including battery chargers and a metering room, along with 3.1km of 33kV cable duct installation, cable pulling, and jointing

20

MVA

3.1km

CABLE DUCT

 INSTALLATION

33kV

DNO

SWITCHROOM

specialisms used

  • Compound construction
  • DNO switchgear & substation
  • 33kV Cables & Duct installation
  • LVAC supplies
  • Jointing & Terminations
  • Hot and cold commissioning
    with Energisation
Early coordination and close collaboration were key to keeping this project on track and minimising disruption.
Martyn Crocker
Operations Director