Value: Multi Million
Voltage: 33kV
Duration: 8 months
33kV Solar Farm Connection
The client required the design and delivery of a 20MVA 33kV DNO switchroom and cable route for a solar development in Staveley, Derbyshire.
THE CHALLENGES
Design approval from NGED presented a key challenge, which was addressed by working closely with the client, their contractors, and NGED to develop an acceptable design. Additionally, potentially disruptive streetworks required careful management, with the JSM Streetworks team collaborating with the local highways authority to secure permits and minimise impact on the local community.
WHAT WE DELIVERED
Supplied and installed a 33kV DNO switchroom including battery chargers and a metering room, along with 3.1km of 33kV cable duct installation, cable pulling, and jointing
20
MVA
3.1km
CABLE DUCT
INSTALLATION
33kV
DNO
SWITCHROOM
specialisms used
- Compound construction
- DNO switchgear & substation
- 33kV Cables & Duct installation
- LVAC supplies
- Jointing & Terminations
- Hot and cold commissioning
with Energisation
“Early coordination and close collaboration were key to keeping this project on track and minimising disruption.“
Martyn Crocker