snap shot
Value: Multi Million
Voltage: 66kV
Duration: 16 months

66kV Electrical Installation

The client required a new cable installation comprising single, dual, and triple 66kV circuits and pilot cables along a 10km route in the London Borough of Hillingdon, connecting into SSE’s network at Iver.

CHALLENGE

Utility crossings faced significant constraints: inadequate duct capacity at the River Colne bridge and high-risk congestion near the River Pinn due to existing high-voltage and telecoms infrastructure. Additional environmental and health risks included flooding, Weil’s disease, and potential impacts on habitats such as bats.

WHAT WE DELIVERED

  • JSM planned, managed, and coordinated all phases of this multi-million project, including detailed design, permitting, construction, commissioning, and handover.
  • The team installed three 66kV circuits to SSE and IDNO standards across Uxbridge and West Drayton, navigating congested roads and utilities.
  • The Special Engineering Difficulties (SEDs) included two specialist river crossings under environmental permits while minimising disruption through proactive stakeholder engagement. Achieved by creating a temporary dam and installing a flume pipe to divert the water and enable open-cut works.

10km

route

66kV

circuits

11kV

circuits

SPECIALISMS USED

  • Cable installation
  • Principal contractor
  • Environmental permits
  • Special Engineering Difficulties (SEDs)
  • Traffic management
  • Safe excavation
This was a complex route through busy urban areas, so planning and coordination were critical from day one. By taking a proactive approach to constraints and working closely with stakeholders, we were able to keep the works moving while minimising disruption to the local community.