JSM is delivering the design and construction of a 90MVA, 33kV contestable connection for a major advanced manufacturing facility. The works combine an approximately 10km off-site cable route with new on-site 33kV and 11kV substation infrastructure, including primary transformers, switchgear, protection and control systems, associated civil engineering and commissioning.

THE CHALLENGES

  • Two separate crossings of the M5 motorway, requiring location-specific engineering, specialist construction planning and close coordination with National Highways and the wider stakeholder team.
  • The crossing of Crandon Bridge at Kings Sedgemoor Drain, requiring bridge-specific design development, surveys, structural assessment and coordinated approvals with the local planning authority, Indigo and affected utility stakeholders.
  • Delivery of a long 33kV route through operational highways, third-party land and constrained working areas, requiring careful traffic management, access planning, utility coordination and sequencing.

WHAT WE DELIVERED

  • A complete 33kV cable connection between Dunwear Point of Supply. And the new on-site substation infrastructure.
  • New 33kV and 11kV compounds incorporating modular switchrooms, primary and auxiliary transformers, switchgear, earthing, drainage, access roads, fencing and supporting services.
  • Engineered solutions for the two M5 crossings and the Crandon Bridge crossing, supported by route-specific surveys, design submissions and stakeholder approvals.

10km

Cable route

33kv

11kv

Substation

90MVA

specialisms used

  • 33kV cable systems
  • Substation design and construction
  • Primary transformers
  • Switchgear installation
  • Highway engineering
  • Bridge crossings
  • Earthing and civil engineering
  • Testing and commissioning
“Supporting the project has required close collaboration across design, engineering, construction and stakeholder teams. The project combines significant substation infrastructure with a complex cable route featuring motorway and bridge crossings, demonstrating JSM’s capability to deliver technically demanding power connection solutions at scale.“
Dean Wingham