Spotlight | Why data centres are turning to private solar power

16/09/2026 | Data Centres, Spotlight

Data centre developers and hyperscalers in the UK are all facing the same problem, and it isn’t rack density or cooling efficiency, it’s grid access. National Grid connection queues within the UK are stretching years in some regions, and with the race to bring capacity online fully underway, a multi-year wait for power is a critical barrier to growth.

It’s a subject Steve Bradley, New Business Director at JSM, spoke about at Solar & Storage Live UK on 24th September, alongside Alex Goodall, CEO & Founder, Xela Energy. The conversation focused on a question more and more operators are asking every quarter: what happens when you stop waiting for the grid, and start generating your own power instead?

Here’s an outline of what that actually looks like in practice, why it’s gaining momentum now, and where the genuine challenges lie.

The Grid Connection Bottleneck Facing UK Data Centres

New connection applications across the UK are currently being offered connection dates into the mid 2030s. For an industry where a delayed connection results in delayed revenue, missed customer commitments, and lost sites altogether, that timeline is simply incompatible with market demand.

The result of this is a growing gap between where operators want to build and where the grid can actually support them. Sites with planning consent, fibre connectivity and customer demand already in place are being put at risk by a connection date that’s years away, which in turn is pushing private power from a theoretical possibility into a genuine reality.

What “Going Private” Actually Means

Private power, at its core, means generating and/or managing electricity on or near the site itself, rather than relying solely on a standard grid import.

For data centres, that most commonly means pairing on-site or co-located solar generation with battery energy storage (BESS), connected to the site via a private wire, rather than depending entirely on the public network.

Private Wire vs a Standard Grid Connection

A standard grid connection draws all of a site’s power through the public distribution network, which is where the queueing problem originates. A private wire, by contrast, is a direct connection between a generation source (such as a solar array) and the site consuming power, built and owned outside the public network. It can run alongside a grid connection, rather than replacing it entirely, to provide an additional source of power that doesn’t depend on brand new network capacity being available.

This is also where an agnostic approach matters. JSM works as an IDNO or private network partner precisely because it isn’t tied to a single connection model. Whether a site needs a private wire arrangement, an IDNO-adopted network, or a hybrid of the two, the right answer depends on the site, not on which option happens to be on offer.

Why Solar Gets Paired with Battery Storage (BESS)

Solar generation alone doesn’t match a data centre’s load profile. Data centres draw power continuously, 24 hours a day, while solar generation is by default limited to daylight hours and can vary with British weather. This is where battery storage steps in. By storing surplus energy when solar generation is at its peak, it can then supply energy over a full 24 hours to help smooth the shortfall between generation and consumption.

Together, solar and battery storage form a microgrid: a self-contained power system that can operate alongside the public grid and reduce a site’s exposure to constrained network capacity, which offers developers and hyperscalers a viable solution for energy constraints.

Why This Is Gaining Ground Now

Outside of the growing timelines for a new grid connection, there are additional pressures converging to make private power a live conversation:

● The cost of grid reinforcement has become highly visible. Industry figures put the cost of new capacity at around £700,000 per megawatt in some cases, a number that changes the economics of self-generation almost overnight.
● Solar and battery technology costs have continued to fall, making on-site generation a genuinely competitive option rather than a premium add-on.

This means self-generation is no longer prohibitively expensive, and waiting for a grid connection is no longer free either. Based on commercials alone, private power is fast becoming the more financially sound route forward.

The Practical Challenges

None of this is turnkey. Any operator considering private power or microgrid solutions should go in with a clear view of what’s involved. Before ground is broken, five things need to be considered:

● Planning consent for on-site or co-located generation, which varies significantly by site and local authority and needs to be scoped early, in the pre-construction phase, not after commitments are made.
● Early and ongoing engagement with the local Distribution Network Operator (DNO) or Independent Distribution Network Operator (IDNO), even where the intention is to reduce reliance on the public network rather than remove it entirely.
● Compliance with the relevant grid codes, including G99 (for generation connecting to distribution networks) and G100 (assessing the impact of larger connections), which govern how private generation interacts safely with the wider grid.
● Realistic modelling of generation versus load, so the solar and BESS system is sized to actual demand rather than a best-case assumption.
● Assessment of the cable route required to link the solar and BESS system to the data centre, through a cable route feasibility study.

These aren’t reasons to avoid private power. They’re reasons to bring in an experienced partner who has done this before: a partner who can navigate planning, network engagement and compliance as a single coordinated process, rather than three separate ones.

How JSM Approaches Private Power Projects

This is where an integrated, in-house delivery model makes a practical difference. Rather than coordinating separate specialists for design, electrical engineering, network connection and construction, JSM manages private power projects end-to-end, from feasibility and DNO/IDNO engagement through to design, installation and commissioning.

That matters because private wire and microgrid projects sit at the intersection of several disciplines: electrical engineering, planning, network regulation and construction delivery.

Splitting those across multiple contractors introduces exactly the kind of delay that operators are trying to design their way out of in the first place.

A single accountable delivery partner, with its own in-house electrical engineering capability and an agnostic approach to connection models, keeps the project moving as one coordinated programme, mitigating wastage and maintaining commercial focus for all parties.

Solar & Storage Live UK

This subject was explored in more depth by Steve Bradley and Alex Goodall during a session at Solar & Storage Live UK on 24th September. The talk looked at how UK data centre operators are approaching private power in practice, and what to weigh up before committing to a project.

Talk to Us About Private Power

If grid connection delays are holding back a site that’s otherwise ready to build, it’s worth a conversation before the next connection offer date is pushed back further still. JSM’s in-house team can assess feasibility and manage the full delivery process, from design through to commissioning. Reach us at connect@jsmgroup.com.