FROM CONCEPT

icon

TO CONNECTION

Biodiversity Opportunities | Bird nesting and Bat Roosting Boxes

 

THE CHALLENGES

Protected UK species such as nesting birds and bats have experienced significant population declines, birds by 11% since 1970 and bats over the past century, mainly due to habitat loss, changes in agricultural practices, and reduced food sources.

THE BENEFIT

Monitoring of installed bird and bat boxes by licensed London Bat Group members has fostered collaboration between National Grid, JSM, and Croydon Council, benefiting protected wildlife in South Croydon.

23

New trees

1SP

Sparrow terrace

2F

Schwegler bat box

specialisms used

  • Schwegler design
  • Vegetation management
  • 1SP sparrow terrace
  • 2F Schwegler bat box
  • Bird nesting
  • Bat roosting
This kind donation will enable us to replace some of the old wooden boxes with the new Schwelgler boxes. The sparrow terrace will make a great addition in Wandle Park, which has a thriving sparrow population.
Meike Weiser
Croydon’s Community Conservation Partnership Officer

FROM CONCEPT

icon

TO CONNECTION

snap shot
Value: Multi Million
Voltage: 33kV
Duration: 10 months

20MVA Battery Energy Storage System

The client requested the design, construction, and commissioning of a 20MVA Battery Energy Storage System (BESS) compound.

THE CHALLENGES

Coordinating works was challenging, with DNO-contracted non-contestable activities taking place alongside JSM on a constrained site, while the installation of 11 batteries, each weighing 32 tonnes, required a complex lifting operation due to limited space.

WHAT WE DELIVERED

  • Works included detailed design and approvals
  • Installation of civil and electrical infrastructure such as plinths for 11nr batteries and 6nr transformers, 700m of 33kV cabling, a 2-panel 33kV switchboard, auxiliary transformer, and fibre connections
  • Temporary works were constructed to support a 300 ton crane that installed the 11nr batteries, each weighing 32 ton

6nr

Transformers

2 panel

33kV

switchboard

700m

33kV

cabling

specialisms used

  • Principal designer
  • Compound construction
  • Compound earthing
  • DNO switchroom & substation
  • Installation of 11nr batteries
  • LVAC supplies
  • Jointing & Terminations
  • Hot and cold commissioning
    with Energisation
Strong coordination and operational control were key to delivering this project efficiently within a constrained site.
Martyn Crocker
Operations Director

FROM CONCEPT

icon

TO CONNECTION

snap shot
Value: Multi Million
Voltage: 33kV
Duration: 10 months

21MVA Battery Energy Storage System

The client required the design, construction, and commissioning of a 21MVA Battery Energy Storage System (BESS) compound in Broadditch, Kent.

THE CHALLENGES

Site earthing presented a challenge due to the 33kV overhead line connection and the planned future 11kV connection, requiring careful consideration of combined fault contributions and differing clearance times. In addition, site constraints made plant installation difficult, as the six 32-ton batteries required a complex lifting operation into position.

WHAT WE DELIVERED

  • 6nr batteries
  • 3nr transformers
  • 460m of 33kV cabling,
  • 2-panel 33kV switchboard,

6nr

Batteries

460m

OF 33kV CABLING

3nr

TRANSFORMERS

specialisms used

  • Compound construction
  • Compound earthing
  • DNO switchgear & substation
  • Battery Installation
  • Duct installation
  • LVAC supplies
  • Jointing & Terminations
  • Hot and cold commissioning
    with Energisation

 

From the outset, the project relied on careful design integration and coordination on site to manage constraints and ensure safe installation. That approach was key to achieving a robust and compliant end result.
Martyn Crocker
Operations Director